Cost Accounting — 2021

KNEC Diploma in Supply Chain Management, Module II. Original theory examination questions with explained model answers for revision.


July 2021

Paper codes: 2903/206
Time: Not shown in supplied scan
Instructions: Not shown in supplied scan

Question 1(a) — 8 marks

Highlight four benefits of using piece rate method of remuneration.

Model answer

  1. Pay is directly linked to output, encouraging workers to increase productive effort.
  2. Efficient workers can earn more by producing more acceptable units, rewarding individual performance.
  3. Labour cost per acceptable unit is predictable where the piece rate is fixed, helping quotations and cost control.
  4. Less close supervision of working pace is needed because earnings depend on measured output, although quality and safety still need checking.

Question 1(b) — 12 marks

Barishak Limited uses material Bx in its production. On 1 January 2021, inventory was 400 units valued at Ksh 20,000. The following transactions relate to the month of January 2021:

Date in January Transaction
2 Received 120 units at Ksh 51 each
4 Issued 80 units
5 Issued 140 units
7 Received 50 units at Ksh 52 each
10 Issued 290 units
14 Issued 5 units
15 Received 320 units at Ksh 50 each
27 Received 200 units at Ksh 49 each
31 Issued 350 units

Prepare a stores ledger account using First In First Out (FIFO) method of inventory valuation.

Model answer

Opening unit cost = 20,000/400 = Ksh 50. Issue the oldest available units first.

Date Receipts: qty × rate = Ksh Issues: qty × rate = Ksh Balance qty Balance Ksh Balance layers
Opening 400 20,000 400 @ 50
Jan 2 120 × 51 = 6,120 520 26,120 400 @ 50; 120 @ 51
Jan 4 80 × 50 = 4,000 440 22,120 320 @ 50; 120 @ 51
Jan 5 140 × 50 = 7,000 300 15,120 180 @ 50; 120 @ 51
Jan 7 50 × 52 = 2,600 350 17,720 180 @ 50; 120 @ 51; 50 @ 52
Jan 10 180 × 50 + 110 × 51 = 14,610 60 3,110 10 @ 51; 50 @ 52
Jan 14 5 × 51 = 255 55 2,855 5 @ 51; 50 @ 52
Jan 15 320 × 50 = 16,000 375 18,855 5 @ 51; 50 @ 52; 320 @ 50
Jan 27 200 × 49 = 9,800 575 28,655 5 @ 51; 50 @ 52; 320 @ 50; 200 @ 49
Jan 31 5 × 51 + 50 × 52 + 295 × 50 = 17,605 225 11,050 25 @ 50; 200 @ 49

Check: total cost available 54,520 − issues 43,470 = closing inventory Ksh 11,050.

Question 2(a) — 8 marks

Explain each of the following types of costs: (i) opportunity cost; (ii) relevant cost; (iii) sunk cost; (iv) unit cost.

Model answer

  1. Opportunity cost is the benefit forgone from the best alternative use of a scarce resource; for example rental income sacrificed by using one’s own building.
  2. Relevant cost is a future cash flow that differs between alternatives and should therefore affect the decision.
  3. Sunk cost is expenditure already incurred that cannot be recovered by changing the current decision, such as completed research spending.
  4. Unit cost is the total cost attributable to an output divided by the number of units produced, using a clearly specified cost scope and period.

Question 2(b) — 12 marks

Ochieng has been offered Ksh 20,000 to repair and paint a motor van. The following information relates to the job.

(i) 4 metres of metal sheet at Ksh 500 per metre

(ii) 20 litres of spray paint at Ksh 150 per litre

(iii) Welding 3 hours at Ksh 400 per hour

(iv) Painting 4 hours Ksh 600 per hour

(v) Wiring Ksh 1,500 per vehicle

(vi) Security Ksh 200 per day

(vii) Riveting 30 rivets at Ksh 20 each

(viii) Administration cost Ksh 2,200

(ix) Parking fee Ksh 150 per day

(i) Ochieng expects to complete the work in 3 days’ period as required by the client.

(ii) Mark up profit is 30%.

(i) Prepare an operation cost statement;

(ii) Advise Ochieng on whether to accept the job or not.

Model answer

Particulars Ksh
Metal sheet: 4 × 500 2,000
Spray paint: 20 × 150 3,000
Welding: 3 × 400 1,200
Painting: 4 × 600 2,400
Wiring 1,500
Security: 3 × 200 600
Rivets: 30 × 20 600
Administration 2,200
Parking: 3 × 150 450
Total operating cost 13,950
Target profit: 30% × 13,950 4,185
Target price 18,135
Offer 20,000
Profit at offer 6,050

Accept the job: the offer exceeds the target price by Ksh 1,865 and earns Ksh 6,050, a markup of 6,050/13,950 × 100 = 43.37%, above the required 30%.

Question 3(a) — 8 marks

Mark and Janet are employed to make bar soaps. In the first week of February 2021, Mark made 1,240 units while Janet made 1,185 units. The time allowed per unit is 10 minutes. Each employee is entitled to a basic wage of Ksh 50 per hour. Bonus is paid at 35% of the basic wage rate. Mark and Janet completed the work in 190 hours and 200 hours respectively.

For each employee, determine the: (i) basic wage; (ii) gross wage.

Model answer

Time allowed = units × 10/60 hours. Basic wage = actual hours × Ksh 50. Bonus = positive time saved × 35% × Ksh 50; no bonus where time taken exceeds time allowed.

Employee Time allowed h Actual h Time saved h Basic Ksh Bonus Ksh Gross Ksh
Mark 206.67 190 16.67 9,500 291.67 9,791.67
Janet 197.50 200 0 10,000 0 10,000

Mark’s bonus is 16⅔ × 17.50 = Ksh 291.67. Janet exceeds her allowed 197.5 hours, so she receives her basic wage without bonus.

Question 3(b) — 12 marks

Hadithi manufactures a product that passes through two processes to completion. The following information relates to the month of January 2021.

Process I:

Particulars Ksh
Materials 6,000 units at Ksh 100 each
Labour 165,000
Overheads 24,000

Process II:

Particulars Ksh
Additional materials 200,000
Packaging 15,000
Overheads 43,000

Additional information:

(i) The expected normal loss is 6% for process I only.

(ii) There was no opening or closing work in progress in the month.

(iii) 5,720 units of the product were transferred from Process I to process II.

Prepare: (i) process I account; (ii) process II account; (iii) abnormal gain/loss account.

Model answer

No scrap value or additional physical units in Process II are stated; normal loss therefore has zero recovery value, and all 5,720 units leave Process II.

Process I account

Step / item Working Result
Total input 6000 + 0 6,000
Total cost Transfer + materials + wages + overheads + expenses 789,000
Normal loss 6000 × 6% 360
Expected output 6000 − 360 5,640
Normal scrap value 360 × 0 0
Cost per good unit (789,000 − 0) ÷ 5640 139.89
Actual output value 5720 × 139.893617 800,191.49
Abnormal gain 5720 − 5640 80
Dr particulars Units Ksh Cr particulars Units Ksh
Input / transfer 6,000 600,000 Normal loss 360 0
Direct wages 165,000 Output transferred 5,720 800,191.49
Overheads 24,000
Abnormal gain 80 11,191.49
Total 6,080 800,191.49 Total 6,080 800,191.49

Process II account

Step / item Working Result
Total input 5720 + 0 5,720
Total cost Transfer + materials + wages + overheads + expenses 1,058,191.49
Normal loss 5720 × 0% 0
Expected output 5720 − 0 5,720
Normal scrap value 0 × 0 0
Cost per good unit (1,058,191.49 − 0) ÷ 5720 185.00
Actual output value 5720 × 184.998512 1,058,191.49
Abnormal gain 5720 − 5720 0
Dr particulars Units Ksh Cr particulars Units Ksh
Input / transfer 5,720 800,191.49 Normal loss 0 0
Materials introduced 200,000 Output transferred 5,720 1,058,191.49
Overheads 43,000
Direct expenses 15,000
Total 5,720 1,058,191.49 Total 5,720 1,058,191.49

Abnormal gain account

Dr — Particulars Ksh Cr — Particulars Ksh
Process I: 80 × 139.893617 11,191.49 Costing profit and loss 11,191.49
Total 11,191.49 Total 11,191.49

Question 4(a) — 8 marks

Explain four advantages of factory job costing.

Model answer

  1. It identifies the cost and profit of each separate job, allowing management to compare profitable and unprofitable orders.
  2. Detailed material, labour and overhead records support reliable quotations for similar future jobs.
  3. Actual job costs can be compared with estimates so waste, excess time and other cost overruns can be investigated.
  4. Job records establish responsibility and provide evidence for charging customers and valuing unfinished jobs.

Question 4(b) — 12 marks

Hausta Limited manufactures cements in batches of 2,000 bags. The following information relates to batch No. AA 44.

Item Department I Department II
Direct materials 6,000 kg at Ksh 90 each 1,000 kg Ksh 10 each
Direct wages 800 hours at Ksh 40 per hour 100 hours at Ksh 70 per hour
Factory overhead 110% on direct wages 70% on prime cost

A client has offered to buy the batch at Ksh 600,000.

(i) Prepare a batch cost statement;

(ii) Advise the management on whether to accept the offer or not.

Model answer

Item Department I Ksh Department II Ksh Total Ksh
Materials 540,000 10,000 550,000
Direct wages 32,000 7,000 39,000
Prime cost 572,000 17,000 589,000
Overhead: I 110%×32,000; II 70%×17,000 35,200 11,900 47,100
Batch factory cost 607,200 28,900 636,100
Step / item Working Result
Cost per bag 636,100 ÷ 2,000 318.05
Offer per bag 600,000 ÷ 2,000 300
Loss at offer 600,000 − 636,100 -36,100

Reject or renegotiate the offer on the full-cost information supplied: it produces a loss of Ksh 36,100. Department II overhead uses its own prime cost; no requirement to include the previous department’s transferred cost in that basis is stated.

Question 5(a) — 8 marks

Explain each of the following terms as used in process costing: (i) normal loss; (ii) abnormal loss; (iii) abnormal gain; (iv) scrap value.

Model answer

  1. Abnormal loss: the loss above the normal allowance, isolated from the cost of efficient output.
  2. Abnormal gain: the saving when actual loss is below the normal allowance.
  3. Normal loss: expected unavoidable wastage under efficient process conditions.
  4. Scrap value: proceeds recoverable from selling the rejected or lost material.

Question 5(b) — 12 marks

Pendaxo Enterprises has two departments; A and B. The following data relates to the departments for the months of February 2021:

Item Department A Department B
Direct materials (Ksh) 1,450,000 90,000
Direct labour hours 30,000 5,000
Direct labour cost (Ksh) 210,000 75,000

Additional information: The firm uses direct labour hours in absorbing overheads in department A and prime cost in department B.

(i) Determine the overhead absorption rate for each department;

(ii) Prepare a cost statement for Job No. 1880 A.

Model answer

Source limitation: the supplied printed question gives neither departmental overhead totals nor the materials and labour used by Job 1880 A. These values are also absent from the scan, so a unique numerical rate or job total cannot be calculated without inventing data.

Step / item Working Result
Department A prime cost 1,450,000 + 210,000 1,660,000
Department B prime cost 90,000 + 75,000 165,000
Required result Correct method with missing data shown explicitly
Department A OAR A’s budgeted overhead ÷ 30,000 = Ksh per direct labour hour
Department B OAR B’s budgeted overhead ÷ 165,000 × 100 = percentage of prime cost
Job prime cost Job’s direct materials + direct labour + any direct expenses
Job overhead, A Job’s A labour hours × A OAR
Job overhead, B Job’s B prime cost × B OAR/100
Job factory cost Job prime cost + A overhead + B overhead

The departmental figures above must not be passed off as the resource usage of Job 1880 A. Once the missing overhead budgets and job particulars are supplied, substitute them in the displayed method.

Question 6(a) — 8 marks

Outline four features of an effective cost accounting system.

Model answer

  1. It suits the organisation’s production methods, cost units and information needs.
  2. It provides accurate and timely cost information using reliable records and consistent procedures.
  3. It is economical to operate, with benefits greater than the cost of collecting and processing data.
  4. It clearly assigns responsibility and reports useful comparisons, while remaining simple enough for staff to understand and flexible enough for operational changes.

Question 6(b) — 12 marks

Seiko Manufacturers has two production departments; machining and assembly and two service departments, canteen and maintenance. The budgeted overheads for the year 2020 was as follows:

Particulars Ksh
Indirect wages 1,000,000
Rent 1,200,000
Lighting 240,000
Depreciation 250,000
Insurance 500,000

Direct allocation:

Item Machinery Ksh Assembly Ksh Canteen Ksh Maintenance Ksh
Administration 130,000 240,000 198,000 190,000
Repairs 550,000 280,000 — 146,000

Additional information: The following data relates to the departments:

Department Machine value Ksh 000 Floor area m² Employees
Machining 1,800 130 10
Assembly 1,400 55 23
Canteen 10 20 2
Maintenance 290 35 15

Prepare an overhead analysis sheet.

Model answer

Use employee numbers for indirect wages, floor area for rent and lighting, and machine values for plant depreciation and insurance. Directly allocated costs go to their stated departments.

Overhead Basis Machining Assembly Canteen Maintenance
Indirect wages Employees 10:23:2:15 200,000 460,000 40,000 300,000
Rent Floor area 130:55:20:35 650,000 275,000 100,000 175,000
Lighting Floor area 130,000 55,000 20,000 35,000
Depreciation Machine value 1,800:1,400:10:290 128,571.43 100,000 714.29 20,714.29
Insurance Machine value 257,142.86 200,000 1,428.57 41,428.57
Administration Direct allocation 130,000 240,000 198,000 190,000
Repairs Direct allocation 550,000 280,000 0 146,000
Total 2,045,714.29 1,610,000 360,142.86 908,142.86

All amounts are Ksh. Total overhead = Ksh 4,924,000. No basis is provided for redistributing service-department costs, so this is the primary overhead analysis requested.

Question 7(a) — 10 marks

Highlight five duties of a cost accountant in a manufacturing firm.

Model answer

  1. Measure costs: collect and classify material, labour and overhead expenditure.
  2. Plan and budget: prepare cost estimates, standards and resource budgets.
  3. Control performance: analyse variances and report waste or inefficiency.
  4. Support decisions: provide relevant cost information for pricing, make-or-buy and product decisions.
  5. Advise management on pricing, product mix and make-or-buy decisions using relevant cost and contribution information.

Question 7(b) — 10 marks

Mjengo Limited was awarded a contract to construct a building block for Ksh 10,000,000. The work began at the start of the year 2019. The following information relates to the year ended 31 December 2020.

Particulars Ksh
Plant on site (1 January 2020) 2,500,000
Plant purchased 1,300,000
Inspection fees 40,000
Materials purchased 1,800,000
Salaries and wages 450,000
Value of work certified 6,935,000
Cost of work not yet certified 1,550,000
Consultancy fees 30,000
Sub-contractors fees 145,000

Balances as at 31 December 2020:

Particulars Ksh
Materials 480,000
Plant 1,900,000
Accrued wages 70,000

Additional information:

(i) It is the policy of the firm to transfer 20% of the notional profit to the income statement.

(ii) The firm sold some of the materials costing Ksh 100,000 at the site.

Prepare a contract account for the year ended 31 December 2020.

Model answer

Step / item Working Result
Plant depreciation 2,500,000 + 1,300,000 − 1,900,000 1,900,000
Materials consumed 1,800,000 − 480,000 − 100,000 1,220,000
Wages accrued 450,000 + 70,000 520,000
Total net contract cost 1,900,000 + 1,220,000 + 520,000 + 40,000 + 30,000 + 145,000 3,855,000
Work value 6,935,000 + 1,550,000 8,485,000
Notional profit 8,485,000 − 3,855,000 4,630,000
Income statement: stated policy 4,630,000 × 20% 926,000
Profit retained in work in progress 4,630,000 × 80% 3,704,000

Contract account

Dr — Particulars Ksh Cr — Particulars Ksh
Plant on site 2,500,000 Closing plant 1,900,000
Plant purchased 1,300,000 Closing materials 480,000
Materials purchased 1,800,000 Materials sold: cost removed 100,000
Wages including accrued 520,000 Work certified 6,935,000
Inspection fees 40,000 Uncertified work 1,550,000
Consultancy fees 30,000
Subcontractors 145,000
Notional profit 4,630,000
Total 10,965,000 Total 10,965,000

The material sale removes its stated cost from the contract; no sale proceeds are given, so no sale profit is invented. The account uses the figures supplied for 2020. No opening certified/uncertified work or prior-year profit balance is supplied despite the 2019 commencement date; therefore a reconciliation of cumulative profit by year is not possible.